Title | Description | TC |
IEC 60364-4-41:2005 | Low voltage electrical installations - Part 4-41: Protection for safety - Protection against electric shock | TC 64 |
IEC 60364-4-42:2010 | Low-voltage electrical installations - Part 4-42: Protection for safety - Protection against thermal effects | TC 64 |
IEC 60364-4-44:2007 | Low-voltage electrical installations - Part 4-44: Protection for safety - Protection against voltage disturbances and electromagnetic disturbances | TC 64 |
IEC 61000-4-30:2015 | Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques - Power quality measurement methods | TC 77 |
IEC 61000-5-1:1996 | Electromagnetic compatibility (EMC) - Part 5: Installation and mitigation guidelines - Section 1: General considerations - Basic EMC publication | TC 77 |
IEC 61000-5-2:1997 | Electromagnetic compatibility (EMC) - Part 5: Installation and mitigation guidelines - Section 2: Earthing and cabling | TC 77 |
IEC 61000-6-2:2016 | Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments | TC 77 |
IEC 61000-6-3:2006 | Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for residential, commercial and light-industrial environments | TC 77 |
IEC 61000-6-4:2018 | Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments | TC 77 |
IEC 61116:1992 | Electromechanical equipment guide for small hydroelectric installations | TC 82 (IEC TC 4) |
IEC 61400-1:2005 | Wind turbines - Part 1: Design requirements | TC 82 (IEC TC 88) |
IEC 61400-2:2013 | Wind turbines - Part 2: Small wind turbines | TC 82 (IEC TC 88) |
IEC 61547:2009 | Equipment for general lighting purposes - EMC immunity requirements | TC 77 (IEC TC 34) |
IEC 62006:2010 | Hydraulic machines - Acceptance tests of small hydroelectric installations | TC 82 (IEC TC 4) |
IEC 62485-1:2015 | Safety requirements for secondary batteries and battery installations - Part 1: General safety information | TC 82 (IEC TC 21) |
IEC 62485-2:2010 | Safety requirements for secondary batteries and battery installations - Part 2: Stationary batteries | TC 82 (IEC TC 21) |
AFSEC 50001-4:2018 ed2 | Guide for application of standards for rural electrification in Africa | TC 82 |
EN 50065-1:2011 | Signalling on low-voltage electrical installations in the frequency range 3 kHz to 148 5 kHz Part 1: General requirements frequency bands and electromagnetic disturbances | TC 13 |
IEC 60079-10-1:2015 | Explosive atmospheres Part 10-1: Classification of areas - Explosive gas atmospheres | TC 31 |
IEC 60079-10-2:2009 | Explosive atmospheres Part 10-2: Classification of areas - Combustible dust atmospheres | TC 31 |
IEC 60079-14:2013 | Explosive atmospheres Part 14: Electrical installations design selection and erection | TC 31 |
IEC 60079-17:2013 | Explosive atmospheres Part 17: Electrical installations inspection and maintenance | TC 31 |
IEC 60079-19:2010 | Explosive atmospheres - Part 19: Equipment repair overhaul and reclamation | TC 31 |
IEC 60364-5-52:2009 | Electrical installations of buildings Selection and erection of electrical equipment Wiring system | TC 64 |
IEC 60364-7-712:2002 | Electrical installations of buildings - Part 7-712: Requirements for special installations or locations - Solar photovoltaic (PV) power supply systems | TC 64 |
IEC 60479-3:1998 | Effects of current on human beings and livestock Part 3: Effects of currents passing through the body of livestock | TC 64 |
IEC 61439-1:2011 | Low-voltage switchgear and controlgear assemblies- - Part 1 :General rules | TC 64 |
IEC 61439-2:2011 | Low voltage switchgear and controlgear assemblies Part 2: Power switchgear and controlgear assemblies | TC 64 |
IEC 61850-10:2012 | Communication networks and systems for power utility automation Part 10: Conformance testing | TC 57 |
IEC 61850-3:2013 | Communication networks and systems for power utility automation Part 3: General requirements | TC 57 |
IEC 61850-4:2011 | Communication networks and systems for power utility automation Part 4: System and project management | TC 57 |
IEC 61850-5:2012 | Communication networks and systems for power utility automation Part 5: Communication requirements for functions and device models | TC 57 |
IEC 61850-6:2009 | Communication networks and systems for power utility automation Part 6: Configuration description language for communication in electrical substations related to IEDs | TC 57 |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation Part 7-1: Basic communication structure - Principles and models | TC 57 |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) | TC 57 |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation Part 7-3: Basic communication structure - Common data classes | TC 57 |
IEC 61850-7-410:2007 | Communication networks and systems for power utility automation Part 7-410: Hydroelectric power plants - Communication for monitoring and control | TC 57 |
IEC 61850-7-410:2012 | Communication networks and systems for power utility automation –Part 7-410: Basic communication structure – Hydroelectric power plants – Communication for monitoring and control | TC 57 |
IEC 61850-7-420:2009 | Communication networks and systems for power utility automation Part 7-420: Basic communication structure - Distributed energy resources logical nodes | TC 57 |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation Part 7-4: Basic communication structure - Compatible logical node classes and data object classes | TC 57 |
IEC 61850-7-510:2012 | Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines. | TC 57 |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 | TC 57 |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 | TC 57 |
IEC 61850-90-5:2012 | Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 | TC 57 |
IEC 62052-11:2003 | Electricity metering equipment (AC) - General requirements tests and test conditions - Part 11: Metering equipment | TC 13 |
IEC 62052-31:2015 | Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 31: Safety requirements [waiting publication by IEC] | TC 13 |
IEC 62053-11:2003 | Electricity metering equipment (a.c.) - Particular requirements Part 11: Electromechanical meters for active energy (classes 0 5 1 and 2) | TC 13 |
IEC 62053-21:2004 | Electricity metering equipment (a.c.) Particular requirements Part 21: Static meters for active energy (classes 1 and 2) | TC 13 |
IEC 62055-31:2005 | Electricity metering - Payment systems Part 31: Particular requirements - Static payment meters for active energy (classes 1 and 2) | TC 13 |
IEC 62055-41:2014 | Electricity metering Payment systems Part 41: Standard transfer specification (STS) Physical layer protocol for one way token carrier systems | TC 13 |
|